Student Housing Fire Safety Systems

For specific details on the fire safety system’s in our residence halls, please visit the links below:

Boland Hall

  • Address: 401 Van Buren Street
  • Building size: 9 floors plus basement and sub-basement, 6 exits
  • Building capacity: 312

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 29
  • Photo-Electric Smoke Detectors: 122
  • Heat Detectors: 25
  • Duct Detectors: 0
  • Alarm: Horns w/Visual: 61
  • Fire Extinguishers: 33
  • Ansul Systems: 0
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 23
  • Water Flow Switches: 14
  • Roof Hatches: 0
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 12, 2019, March 19, 2019, Sept. 17, 2019, and Oct. 17, 2019
  • Smoke detection certification: May 14, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019

Booth Hall

  • Address: 505 Comstock Avenue
  • Building size: 9 floors plus basement, 4 exits
  • Building capacity: 261

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 27
  • Photo-Electric Smoke Detectors: 158
  • Heat Detectors: 18
  • Duct Detectors: 0
  • Alarm: Horns w/Visual: 70
  • Fire Extinguishers: 33
  • Ansul Systems: 0
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 22
  • Water Flow Switches: 18
  • Roof Hatches: 0
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 5, 2019, March 19, 2019, Sept. 18, 2019, and Oct. 15, 2019
  • Smoke detection certification: May 14, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019

Brewster Hall

  • Address: 401 Van Buren Street
  • Building size: 13 floors plus basement and subbasement, 5 exits
  • Building capacity: 444

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 38
  • Photo-Electric Smoke Detectors: 163
  • Heat Detectors: 24
  • Duct Detectors: 3
  • Alarm: Horns w/Visual: 66
  • Fire Extinguishers: 41
  • Ansul Systems: 0
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 27
  • Water Flow Switches: 20
  • Roof Hatches: 0
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 12, 2019, March 19, 2019, Sept. 17, 2019, and Oct. 17, 2019
  • Smoke detection certification: May 14, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019

Brockway Hall

  • Address: 401 Van Buren Street
  • Building size: 3 floors, 6 exits
  • Building capacity: 27

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 38
  • Photo-Electric Smoke Detectors: 163
  • Heat Detectors: 24
  • Duct Detectors: 3
  • Alarm: Horns w/Visual: 66
  • Fire Extinguishers: 13
  • Ansul Systems: 5
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 27
  • Water Flow Switches: 20
  • Roof Hatches: 0
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 12, 2019, March 19, 2019, Sept. 17, 2019, and Oct. 17, 2019
  • Smoke detection certification: May 14, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019

Chinook Drive Apartments (South Campus)

  • Address: Chinook Drive
  • Building size: 2 floors
  • Building capacity: 8 apartments

Fire Protection Systems

  • Sprinkler System: No Sprinkler System
  • Smoke Detectors: Single Station Local Alarms
  • Fire Extinguishers: In Every Apartment

Inspection, Testing and Maintenance

  • Smoke detection certification: May 19, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 13, 2019

Day Hall

  • Address: 300 Mt. Olympus Drive
  • Building size: 8 floors plus basement and elevator penthouse, 7 exits
  • Building capacity: 607

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 59
  • Photo-Electric Smoke Detectors: 208
  • Heat Detectors: 35
  • Duct Detectors: 0
  • Alarm: Horns w/Visual: 75
  • Fire Extinguishers: 46
  • Ansul Systems: 0
  • Fire Alarm Control Panel: FCI-FCID
  • Sprinkler Supervisory: 32
  • Water Flow Switches: 20
  • Roof Hatches: 4
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 5, 2019, March 18, 2019, Sept. 17, 2019, and Oct. 14, 2019
  • Smoke detection certification: Aug. 5, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019

Dellplain Hall

  • Address: 601 Comstock Avenue
  • Building size: 9 floors plus basement, 5 exits
  • Building capacity: 436

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 34
  • Photo-Electric Smoke Detectors: 197
  • Heat Detectors: 28
  • Duct Detectors: 0
  • Alarm: Horns with Visual: 54
  • Fire Extinguishers: 33
  • Ansul Systems: 0
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 26
  • Water Flow Switches: 20
  • Roof Hatches: 0
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 7, 2019, March 19, 2019, Sept. 6, 2019, and Oct. 15, 2019
  • Smoke detection certification: Aug. 5, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019

Ernie Davis Hall

  • Address: 619 Comstock Avenue
  • Building size: 9 floors plus basement, 9 exits
  • Building capacity: 250

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 35
  • Photo-Electric Smoke Detectors: 429
  • Heat Detectors: 19
  • Duct Detectors: 197
  • Alarm: Horns with Visual: 280
  • Fire Extinguishers: 34
  • Ansul Systems: 0
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 23
  • Water Flow Switches: 12
  • Roof Hatches: 0
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 1
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 7, 2019, March 21, 2019, Sept. 16, 2019, and Oct. 15, 2019
  • Smoke detection certification: June 10, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019

Farm Acre Apartments (South Campus)

  • Address: Farm Acre Road
  • Building size: 2 floors
  • Building capacity: 8 apartments

Fire Protection Systems

  • Sprinkler System: No Sprinkler System
  • Smoke Detectors: Single Station Local Alarms
  • Fire Extinguishers: In Every Apartment

Inspection, Testing and Maintenance

  • Smoke detection certification: Aug. 20, 2019
  • NYS Office of Fire Prevention and Control Inspection: Sept.19, 2019

Flint Hall

  • Address: 100 Mt. Olympus Drive
  • Building size: 4 floors plus basement, 11 exits
  • Building capacity: 551

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 41
  • Photo-Electric Smoke Detectors: 157
  • Heat Detectors: 33
  • Duct Detectors: 0
  • Alarm: Horns with Visual: 85
  • Fire Extinguishers: 36
  • Ansul Systems: 0
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 31
  • Water Flow Switches: 26
  • Roof Hatches: 0
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 5, 2019, March 21, 2019, Sept. 17, 2019, and Oct. 14, 2019
  • Smoke detection certification: June 10, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 13, 2019

Haven Hall

  • Address: 400 Comstock Avenue
  • Building size: 11 floors plus basement and penthouse, 6 exits
  • Building capacity: 373

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 37
  • Photo-Electric Smoke Detectors: 269
  • Heat Detectors: 50
  • Duct Detectors: 4
  • Alarm: Horns w/Visual: 25
  • Fire Extinguishers: 52
  • Ansul Systems: 4
  • Fire Alarm Control Panel: FCI/FC7200
  • Sprinkler Supervisory: 36
  • Water Flow Switches: 26
  • Roof Hatches: 0
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 7, 2019, March 20, 2019, Sept. 19, 2019, and Oct. 14, 2019
  • Smoke detection certification: May 13, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019

Lambreth Lane Apartments (South Campus)

  • Address: Lambreth Lane
  • Building size: 2 floors
  • Building capacity: 8 apartments

Fire Protection Systems

  • Sprinkler System: No Sprinkler System
  • Smoke Detectors: Single Station Local Alarms
  • Fire Extinguishers: In Every Apartment

Inspection, Testing and Maintenance

  • Smoke detection certification: July 19, 2019
  • NYS Office of Fire Prevention and Control Inspection: Sept. 20, 2019

Lawrinson Hall

  • Address: 303 Stadium Place
  • Building size: 21 floors plus basement and subbasement, 5 exits
  • Building capacity: 552

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 53
  • Photo-Electric Smoke Detectors: 118
  • Heat Detectors: 71
  • Duct Detectors: 3
  • Alarm: Horns w/Visual: 232
  • Fire Extinguishers: 48
  • Ansul Systems: 0
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 35
  • Water Flow Switches: 32
  • Roof Hatches: 3
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 6, 2019, March 22, 2019, Sept. 17, 2019, and Oct. 16, 2019
  • Smoke detection certification: May 14, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019

Lyons Hall

  • Address: 401 Euclid Avenue
  • Building size: 3 floors plus basement, 2 exits
  • Building capacity: 38

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 1 pre-action dry system covers the electrical vault and the elevator mechanical room.
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 8
  • Photo-Electric Smoke Detectors: 26
  • Heat Detectors: 2
  • Duct Detectors: 0
  • Alarm: Bells w/Visual – 5, Strobes only – 2
  • Fire Extinguishers: 5
  • Ansul Systems: 0
  • Fire Alarm Control Panel: FCI
  • Sprinkler Supervisory: 1
  • Water Flow Switches: 2
  • Roof Hatches: 2
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 13, 2019, March 19, 2019, Sept. 16, 2019, and Oct. 14, 2019
  • Smoke detection certification: May 14, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 13, 2019

Sadler Hall

  • Address: 1000 Irving Avenue
  • Building size: 9 floors plus basement, 8 exits
  • Building capacity: 471

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 33
  • Photo-Electric Smoke Detectors: 190
  • Heat Detectors: 60
  • Duct Detectors: 3
  • Alarm – Bells with Visual: 91
  • Fire Extinguishers: 34
  • Ansul Systems: 1
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 24
  • Water Flow Switches: 17
  • Roof Hatches: 3
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 6, 2019, March 22, 2019, Sept. 17, 2019, and Oct. 16, 2019
  • Smoke detection certification: May 14, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 13, 2019

Shaw Hall

  • Address: 775 Comstock Avenue
  • Building size: 5 floors plus basement, 10 exits
  • Building capacity: 460

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 36
  • Photo-Electric Smoke Detectors: 172
  • Heat Detectors: 27
  • Duct Detectors: 6
  • Alarm – Bells with Visual: 79
  • Fire Extinguishers: 39
  • Ansul Systems: 6
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 29
  • Water Flow Switches: 21
  • Roof Hatches: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 13, 2019, March 19, 2019, Sept. 16, 2019, and Oct. 17, 2019
  • Smoke detection certification: May 15, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019

Skyhall 1

  • Address: 410 Lambreth Lane
  • Building size: 3 floors plus basement, 3 exits
  • Building capacity: 117

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 13
  • Photo-Electric Smoke Detectors: 36
  • Heat Detectors: 12
  • Duct Detectors: 0
  • Alarm – Bells with Visual: 91
  • Fire Extinguishers: 10
  • Ansul Systems: 0
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 9
  • Water Flow Switches: 4
  • Roof Hatches: 3
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 6, 2019, March 20, 2019, Sept. 20, 2019, and Oct. 15, 2019
  • Smoke detection certification: May 16, 2019
  • NYS Office of Fire Prevention and Control Inspection: Sept. 19, 2019

Skyhall 2

  • Address: 420 Lambreth Lane
  • Building size: 3 floors plus basement, 3 exits
  • Building capacity: 117

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 13
  • Photo-Electric Smoke Detectors: 36
  • Heat Detectors: 12
  • Duct Detectors: 0
  • Alarm – Bells with Visual: 91
  • Fire Extinguishers: 10
  • Ansul Systems: 0
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 9
  • Water Flow Switches: 4
  • Roof Hatches: 3
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 6, 2019, March 20, 2019, Sept. 20, 2019, and Oct. 15, 2019
  • Smoke detection certification: May 16, 2019
  • NYS Office of Fire Prevention and Control Inspection: Sept. 19, 2019

Skyhall 3

  • Address: 430 Lambreth Lane
  • Building size: 3 floors plus basement, 3 exits
  • Building capacity: 117

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 13
  • Photo-Electric Smoke Detectors: 36
  • Heat Detectors: 12
  • Duct Detectors: 0
  • Alarm – Bells with Visual: 91
  • Fire Extinguishers: 10
  • Ansul Systems: 0
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 9
  • Water Flow Switches: 4
  • Roof Hatches: 3
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 6, 2019, March 20, 2019, Sept. 20, 2019, and Oct. 15, 2019
  • Smoke detection certification: May 16, 2019
  • NYS Office of Fire Prevention and Control Inspection: Sept. 19, 2019

Small Road Apartments (South Campus)

  • Address: Small Road
  • Building size: 2 Floors
  • Building capacity: 8 Apartments

Fire Protection Systems

  • Sprinkler System: No Sprinkler System
  • Smoke Detectors: Single Stations Local Alarms
  • Fire Extinguishers: In Every Apartment

Inspection, Testing and Maintenance

  • Smoke detection certification: Aug.19, 2019
  • NYS Office of Fire Prevention and Control Inspection: Sept. 20, 2019

Walnut Hall

  • Address: 809 Walnut Avenue
  • Building size: 4 floors plus basement, 3 exits
  • Building capacity: 46

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 7
  • Photo-Electric Smoke Detectors: 38
  • Heat Detectors: 4
  • Duct Detectors: 0
  • Alarm – Bells with Visual: 10
  • Fire Extinguishers: 9
  • Ansul Systems: 0
  • Fire Alarm Control Panel: FCI
  • Sprinkler Supervisory: 2
  • Water Flow Switches: 1
  • Roof Hatches: 0
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 7, 2019, March 20, 2019, Sept. 18, 2019, and Oct. 16, 2019
  • Smoke detection certification: May 13, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 13, 2019

Washington Arms

  • Address: 621 Walnut Avenue
  • Building size: 6 floors, 3 exits
  • Building capacity: 63

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 12
  • Photo-Electric Smoke Detectors: 24
  • Heat Detectors: 15
  • Duct Detectors: 0
  • Alarm – Bells with Visual: 10
  • Fire Extinguishers: 12
  • Ansul Systems: 0
  • Fire Alarm Control Panel: EST-2
  • Sprinkler Supervisory: 5
  • Water Flow Switches: 3
  • Roof Hatches: 0
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 7, 2019, March 20, 2019, Sept. 19, 2019, and Oct. 14, 2019
  • Smoke detection certification: May 13, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019

Watson Hall

  • Address: 403 University Place
  • Building size: 5 floors plus basement, 17 exits
  • Building capacity: 448

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 41
  • Photo-Electric Smoke Detectors: 189
  • Heat Detectors: 11
  • Duct Detectors: 6
  • Alarm – Bells with Visual: 232
  • Fire Extinguishers: 60
  • Ansul Systems: 0
  • Fire Alarm Control Panel: FCI
  • Sprinkler Supervisory: 34
  • Water Flow Switches: 31
  • Roof Hatches: 4
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 7, 2019, March 20, 2019, Sept. 19, 2019, and Oct. 14, 2019
  • Smoke detection certification: May 14, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019

Winding Ridge Apartments (South Campus)

  • Address: Lambreth Lane
  • Building size: 2 floors
  • Building capacity: 8 and 12 apartments

Fire Protection Systems

  • Sprinkler System: No Sprinkler System
  • Smoke Detectors: Single Station Local Alarms
  • Fire Extinguishers: In Every Apartment

Inspection, Testing and Maintenance

  • Smoke detection certification: June 17, 2019
  • NYS Office of Fire Prevention and Control Inspection: Sept. 20, 2019