For specific details on the fire safety system’s in our residence halls, please visit the links below:
Boland Hall
Boland Hall
- Address: 401 Van Buren Street
- Building size: 9 floors plus basement and sub-basement, 6 exits
- Building capacity: 312
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 29
- Photo-Electric Smoke Detectors: 122
- Heat Detectors: 25
- Duct Detectors: 0
- Alarm: Horns w/Visual: 61
- Fire Extinguishers: 33
- Ansul Systems: 0
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 23
- Water Flow Switches: 14
- Roof Hatches: 0
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 12, 2019, March 19, 2019, Sept. 17, 2019, and Oct. 17, 2019
- Smoke detection certification: May 14, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019
Booth Hall
Booth Hall
- Address: 505 Comstock Avenue
- Building size: 9 floors plus basement, 4 exits
- Building capacity: 261
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 27
- Photo-Electric Smoke Detectors: 158
- Heat Detectors: 18
- Duct Detectors: 0
- Alarm: Horns w/Visual: 70
- Fire Extinguishers: 33
- Ansul Systems: 0
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 22
- Water Flow Switches: 18
- Roof Hatches: 0
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 5, 2019, March 19, 2019, Sept. 18, 2019, and Oct. 15, 2019
- Smoke detection certification: May 14, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019
Brewster Hall
Brewster Hall
- Address: 401 Van Buren Street
- Building size: 13 floors plus basement and subbasement, 5 exits
- Building capacity: 444
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 38
- Photo-Electric Smoke Detectors: 163
- Heat Detectors: 24
- Duct Detectors: 3
- Alarm: Horns w/Visual: 66
- Fire Extinguishers: 41
- Ansul Systems: 0
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 27
- Water Flow Switches: 20
- Roof Hatches: 0
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 12, 2019, March 19, 2019, Sept. 17, 2019, and Oct. 17, 2019
- Smoke detection certification: May 14, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019
Brockway Hall
Brockway Hall
- Address: 401 Van Buren Street
- Building size: 3 floors, 6 exits
- Building capacity: 27
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 38
- Photo-Electric Smoke Detectors: 163
- Heat Detectors: 24
- Duct Detectors: 3
- Alarm: Horns w/Visual: 66
- Fire Extinguishers: 13
- Ansul Systems: 5
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 27
- Water Flow Switches: 20
- Roof Hatches: 0
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 12, 2019, March 19, 2019, Sept. 17, 2019, and Oct. 17, 2019
- Smoke detection certification: May 14, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019
Chinook Drive Apartments
Chinook Drive Apartments (South Campus)
- Address: Chinook Drive
- Building size: 2 floors
- Building capacity: 8 apartments
Fire Protection Systems
- Sprinkler System: No Sprinkler System
- Smoke Detectors: Single Station Local Alarms
- Fire Extinguishers: In Every Apartment
Inspection, Testing and Maintenance
- Smoke detection certification: May 19, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 13, 2019
Day Hall
Day Hall
- Address: 300 Mt. Olympus Drive
- Building size: 8 floors plus basement and elevator penthouse, 7 exits
- Building capacity: 607
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 59
- Photo-Electric Smoke Detectors: 208
- Heat Detectors: 35
- Duct Detectors: 0
- Alarm: Horns w/Visual: 75
- Fire Extinguishers: 46
- Ansul Systems: 0
- Fire Alarm Control Panel: FCI-FCID
- Sprinkler Supervisory: 32
- Water Flow Switches: 20
- Roof Hatches: 4
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 5, 2019, March 18, 2019, Sept. 17, 2019, and Oct. 14, 2019
- Smoke detection certification: Aug. 5, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019
Dellplain Hall
Dellplain Hall
- Address: 601 Comstock Avenue
- Building size: 9 floors plus basement, 5 exits
- Building capacity: 436
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 34
- Photo-Electric Smoke Detectors: 197
- Heat Detectors: 28
- Duct Detectors: 0
- Alarm: Horns with Visual: 54
- Fire Extinguishers: 33
- Ansul Systems: 0
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 26
- Water Flow Switches: 20
- Roof Hatches: 0
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 7, 2019, March 19, 2019, Sept. 6, 2019, and Oct. 15, 2019
- Smoke detection certification: Aug. 5, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019
Ernie Davis Hall
Ernie Davis Hall
- Address: 619 Comstock Avenue
- Building size: 9 floors plus basement, 9 exits
- Building capacity: 250
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 35
- Photo-Electric Smoke Detectors: 429
- Heat Detectors: 19
- Duct Detectors: 197
- Alarm: Horns with Visual: 280
- Fire Extinguishers: 34
- Ansul Systems: 0
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 23
- Water Flow Switches: 12
- Roof Hatches: 0
- Fire Shutters/Louvers: 0
- Beam Detectors: 1
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 7, 2019, March 21, 2019, Sept. 16, 2019, and Oct. 15, 2019
- Smoke detection certification: June 10, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019
Farm Acre Apartments
Farm Acre Apartments (South Campus)
- Address: Farm Acre Road
- Building size: 2 floors
- Building capacity: 8 apartments
Fire Protection Systems
- Sprinkler System: No Sprinkler System
- Smoke Detectors: Single Station Local Alarms
- Fire Extinguishers: In Every Apartment
Inspection, Testing and Maintenance
- Smoke detection certification: Aug. 20, 2019
- NYS Office of Fire Prevention and Control Inspection: Sept.19, 2019
Flint Hall
Flint Hall
- Address: 100 Mt. Olympus Drive
- Building size: 4 floors plus basement, 11 exits
- Building capacity: 551
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 41
- Photo-Electric Smoke Detectors: 157
- Heat Detectors: 33
- Duct Detectors: 0
- Alarm: Horns with Visual: 85
- Fire Extinguishers: 36
- Ansul Systems: 0
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 31
- Water Flow Switches: 26
- Roof Hatches: 0
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 5, 2019, March 21, 2019, Sept. 17, 2019, and Oct. 14, 2019
- Smoke detection certification: June 10, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 13, 2019
Haven Hall
Haven Hall
- Address: 400 Comstock Avenue
- Building size: 11 floors plus basement and penthouse, 6 exits
- Building capacity: 373
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 37
- Photo-Electric Smoke Detectors: 269
- Heat Detectors: 50
- Duct Detectors: 4
- Alarm: Horns w/Visual: 25
- Fire Extinguishers: 52
- Ansul Systems: 4
- Fire Alarm Control Panel: FCI/FC7200
- Sprinkler Supervisory: 36
- Water Flow Switches: 26
- Roof Hatches: 0
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 7, 2019, March 20, 2019, Sept. 19, 2019, and Oct. 14, 2019
- Smoke detection certification: May 13, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019
Lambreth Lane Apartments
Lambreth Lane Apartments (South Campus)
- Address: Lambreth Lane
- Building size: 2 floors
- Building capacity: 8 apartments
Fire Protection Systems
- Sprinkler System: No Sprinkler System
- Smoke Detectors: Single Station Local Alarms
- Fire Extinguishers: In Every Apartment
Inspection, Testing and Maintenance
- Smoke detection certification: July 19, 2019
- NYS Office of Fire Prevention and Control Inspection: Sept. 20, 2019
Lawrinson Hall
Lawrinson Hall
- Address: 303 Stadium Place
- Building size: 21 floors plus basement and subbasement, 5 exits
- Building capacity: 552
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 53
- Photo-Electric Smoke Detectors: 118
- Heat Detectors: 71
- Duct Detectors: 3
- Alarm: Horns w/Visual: 232
- Fire Extinguishers: 48
- Ansul Systems: 0
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 35
- Water Flow Switches: 32
- Roof Hatches: 3
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 6, 2019, March 22, 2019, Sept. 17, 2019, and Oct. 16, 2019
- Smoke detection certification: May 14, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019
Lyons Hall
Lyons Hall
- Address: 401 Euclid Avenue
- Building size: 3 floors plus basement, 2 exits
- Building capacity: 38
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms; 1 pre-action dry system covers the electrical vault and the elevator mechanical room.
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 8
- Photo-Electric Smoke Detectors: 26
- Heat Detectors: 2
- Duct Detectors: 0
- Alarm: Bells w/Visual – 5, Strobes only – 2
- Fire Extinguishers: 5
- Ansul Systems: 0
- Fire Alarm Control Panel: FCI
- Sprinkler Supervisory: 1
- Water Flow Switches: 2
- Roof Hatches: 2
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 13, 2019, March 19, 2019, Sept. 16, 2019, and Oct. 14, 2019
- Smoke detection certification: May 14, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 13, 2019
Sadler Hall
Sadler Hall
- Address: 1000 Irving Avenue
- Building size: 9 floors plus basement, 8 exits
- Building capacity: 471
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 33
- Photo-Electric Smoke Detectors: 190
- Heat Detectors: 60
- Duct Detectors: 3
- Alarm – Bells with Visual: 91
- Fire Extinguishers: 34
- Ansul Systems: 1
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 24
- Water Flow Switches: 17
- Roof Hatches: 3
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 6, 2019, March 22, 2019, Sept. 17, 2019, and Oct. 16, 2019
- Smoke detection certification: May 14, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 13, 2019
Shaw Hall
Shaw Hall
- Address: 775 Comstock Avenue
- Building size: 5 floors plus basement, 10 exits
- Building capacity: 460
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 36
- Photo-Electric Smoke Detectors: 172
- Heat Detectors: 27
- Duct Detectors: 6
- Alarm – Bells with Visual: 79
- Fire Extinguishers: 39
- Ansul Systems: 6
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 29
- Water Flow Switches: 21
- Roof Hatches: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 13, 2019, March 19, 2019, Sept. 16, 2019, and Oct. 17, 2019
- Smoke detection certification: May 15, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019
Skyhall 1
Skyhall 1
- Address: 410 Lambreth Lane
- Building size: 3 floors plus basement, 3 exits
- Building capacity: 117
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 13
- Photo-Electric Smoke Detectors: 36
- Heat Detectors: 12
- Duct Detectors: 0
- Alarm – Bells with Visual: 91
- Fire Extinguishers: 10
- Ansul Systems: 0
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 9
- Water Flow Switches: 4
- Roof Hatches: 3
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 6, 2019, March 20, 2019, Sept. 20, 2019, and Oct. 15, 2019
- Smoke detection certification: May 16, 2019
- NYS Office of Fire Prevention and Control Inspection: Sept. 19, 2019
Skyhall 2
Skyhall 2
- Address: 420 Lambreth Lane
- Building size: 3 floors plus basement, 3 exits
- Building capacity: 117
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 13
- Photo-Electric Smoke Detectors: 36
- Heat Detectors: 12
- Duct Detectors: 0
- Alarm – Bells with Visual: 91
- Fire Extinguishers: 10
- Ansul Systems: 0
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 9
- Water Flow Switches: 4
- Roof Hatches: 3
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 6, 2019, March 20, 2019, Sept. 20, 2019, and Oct. 15, 2019
- Smoke detection certification: May 16, 2019
- NYS Office of Fire Prevention and Control Inspection: Sept. 19, 2019
Skyhall 3
Skyhall 3
- Address: 430 Lambreth Lane
- Building size: 3 floors plus basement, 3 exits
- Building capacity: 117
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 13
- Photo-Electric Smoke Detectors: 36
- Heat Detectors: 12
- Duct Detectors: 0
- Alarm – Bells with Visual: 91
- Fire Extinguishers: 10
- Ansul Systems: 0
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 9
- Water Flow Switches: 4
- Roof Hatches: 3
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 6, 2019, March 20, 2019, Sept. 20, 2019, and Oct. 15, 2019
- Smoke detection certification: May 16, 2019
- NYS Office of Fire Prevention and Control Inspection: Sept. 19, 2019
Small Road Apartments
Small Road Apartments (South Campus)
- Address: Small Road
- Building size: 2 Floors
- Building capacity: 8 Apartments
Fire Protection Systems
- Sprinkler System: No Sprinkler System
- Smoke Detectors: Single Stations Local Alarms
- Fire Extinguishers: In Every Apartment
Inspection, Testing and Maintenance
- Smoke detection certification: Aug.19, 2019
- NYS Office of Fire Prevention and Control Inspection: Sept. 20, 2019
Walnut Hall
Walnut Hall
- Address: 809 Walnut Avenue
- Building size: 4 floors plus basement, 3 exits
- Building capacity: 46
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 7
- Photo-Electric Smoke Detectors: 38
- Heat Detectors: 4
- Duct Detectors: 0
- Alarm – Bells with Visual: 10
- Fire Extinguishers: 9
- Ansul Systems: 0
- Fire Alarm Control Panel: FCI
- Sprinkler Supervisory: 2
- Water Flow Switches: 1
- Roof Hatches: 0
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 7, 2019, March 20, 2019, Sept. 18, 2019, and Oct. 16, 2019
- Smoke detection certification: May 13, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 13, 2019
Washington Arms
Washington Arms
- Address: 621 Walnut Avenue
- Building size: 6 floors, 3 exits
- Building capacity: 63
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 12
- Photo-Electric Smoke Detectors: 24
- Heat Detectors: 15
- Duct Detectors: 0
- Alarm – Bells with Visual: 10
- Fire Extinguishers: 12
- Ansul Systems: 0
- Fire Alarm Control Panel: EST-2
- Sprinkler Supervisory: 5
- Water Flow Switches: 3
- Roof Hatches: 0
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 7, 2019, March 20, 2019, Sept. 19, 2019, and Oct. 14, 2019
- Smoke detection certification: May 13, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019
Watson Hall
Watson Hall
- Address: 403 University Place
- Building size: 5 floors plus basement, 17 exits
- Building capacity: 448
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 41
- Photo-Electric Smoke Detectors: 189
- Heat Detectors: 11
- Duct Detectors: 6
- Alarm – Bells with Visual: 232
- Fire Extinguishers: 60
- Ansul Systems: 0
- Fire Alarm Control Panel: FCI
- Sprinkler Supervisory: 34
- Water Flow Switches: 31
- Roof Hatches: 4
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 7, 2019, March 20, 2019, Sept. 19, 2019, and Oct. 14, 2019
- Smoke detection certification: May 14, 2019
- NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019
Winding Ridge Apartments
Winding Ridge Apartments (South Campus)
- Address: Lambreth Lane
- Building size: 2 floors
- Building capacity: 8 and 12 apartments
Fire Protection Systems
- Sprinkler System: No Sprinkler System
- Smoke Detectors: Single Station Local Alarms
- Fire Extinguishers: In Every Apartment
Inspection, Testing and Maintenance
- Smoke detection certification: June 17, 2019
- NYS Office of Fire Prevention and Control Inspection: Sept. 20, 2019