The cupolas atop historic Crouse College are being removed and restored this summer. The first was carefully detached from its rooftop placement and lowered by a large crane to ground level on Wednesday morning (May 23), with the other two to follow. They will be rebuilt on site and reinstalled in mid-August.
See photos by Eliot Raynes at Syracuse University News.