Energy Savings Realized Upon Completion of CST Project

Improvements were made to the mechanical systems at the Center for Science and Technology (CST) in 2021 and 2022. The multi-phase plan started in 2019 and is now complete. The project involved adding an energy recovery loop to the laboratory exhaust and reconfiguring the chillers to operate in heat recovery mode. These upgrades have resulted in a 25% reduction in steam use in 2023 and an annual emissions reduction of over 500 metric tons of carbon dioxide equivalent (MTCO2e).

Read the full story at Syracuse University News.